IEC 62817, UL 2703 and UL 3703: Which Standard Covers What

Date:

Three standards are repeatedly named in tracker and racking tenders. They do not cover the same objects, and mixing them up can remove a required structural check from a specification.

UL 3703 addresses solar trackers, but its scope explicitly excludes wind, seismic and foundation design as well as uplift at the platform connection, and it does not apply to trackers installed over water, near-shore or above standing water.

IEC 62817 is a design-qualification and type-test standard. UL 2703 covers mounting systems and modules in a different scope. A 'CE mark' is not the same class of document as either.

Vertical axis solar tracker back side tilt could be less so that the solar panels don't block out the sun for the one behind it. — illustrative photograph for IEC 62817, UL 2703 and UL 3703: Which Standard Covers What
W01 · Illustrative photograph. Vertical axis solar tracker back side tilt.webp by Wikideas1 / Wikimedia Commons, CC0; cropped to 3:2. This is an industry photograph, not a photograph of the event described above.

Why this entry exists

The scope matrix

We publish a three-column matrix: what each standard covers, what it expressly excludes, and which installation environments are in scope. Procurement teams can lift it directly into a checklist.

The framework

Checklist for tender documents

Ask separately for tracker type test evidence, structural and foundation design to the relevant building code, module attachment evidence, and corrosion classification. One certificate cannot answer all four.

Status matters

Some documents are active, others are in development. Every entry in the Wiki carries a status and a last-verified date so a reader knows whether they are reading current or proposed scope.

Data box

Field Value as reported
IEC 62817 Tracker design qualification and type testing
UL 2703 Mounting systems and modules, distinct scope
UL 3703 Trackers; excludes wind, seismic, foundation and platform-connection uplift; excludes water/near-shore installations
Status field Active / in development / proposed
Related structural codes EN 1090, EN 1993, AS/NZS 1170

All figures above are quoted with the unit and reference period used by the primary source. They are reproduced here for reference, not independently re-measured.

How to use it in a tender or a brief: verification note

UL 3703 exclusions must be quoted in the words of the standard's scope. A CE marking and IEC design qualification are different classes of compliance document and are never listed as equivalent.

What to watch next

The publication status of IEC 62817-1 ED1 and any revision to the UL 3703 scope.

Primary sources

  • UL Solutions / UL 3703 Scope (CSDS proposal published 2026-07-27)
  • UL 2703 scope
  • IEC 62817:2014+AMD1:2017+AMD2:2026 CSV

Researched and written by the solarrack.wiki editorial desk. Every figure in this article carries a source and a verification note; where a claim could not be confirmed against a primary document, it is labelled as such. Corrections: [email protected]

Solar Rack
Solar Rackhttps://www.solarrack.wiki
Research, reporting and source verification for SolarRack.Wiki, an independent English-language publication covering PV mounting structures and solar trackers.

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Burberry is the First Brand to get an Apple Music Channel Line

Find people with high expectations and a low tolerance...

For Composer Drew Silva, Music is all About Embracing Life

Find people with high expectations and a low tolerance...

Pixar Brings it’s Animated Movies to Life with Studio Music

Find people with high expectations and a low tolerance...

Concert Shows Will Stream on Netflix, Amazon and Hulu this Year

Find people with high expectations and a low tolerance...